{"id":43,"date":"2026-03-14T14:44:03","date_gmt":"2026-03-14T06:44:03","guid":{"rendered":"http:\/\/47.253.14.151\/index.php\/services\/"},"modified":"2026-05-04T10:23:19","modified_gmt":"2026-05-04T02:23:19","slug":"services","status":"publish","type":"page","link":"https:\/\/www.zjtoppower.com\/index.php\/services\/","title":{"rendered":"Services"},"content":{"rendered":"<h1>Installation of power transformers<\/h1>\n<ul>\n<li>The transformer installation strictly adhered to construction specifications and design requirements. Safety warning zones were set up on-site, and certified personnel performed the work. Professional lifting equipment was used to smoothly hoist the transformer onto the pre-set foundation, ensuring precise leveling and vertical alignment, followed by the secure fastening of anchor bolts.<\/li>\n<li>Subsequently, the processes of accessory assembly, high and low voltage busbar connection, grounding system installation, and sealing inspection were carried out in sequence, with comprehensive construction records and quality control maintained throughout. All operations were performed in a standardized and orderly manner to ensure secure installation, reliable wiring, and compliance with grounding standards, providing a solid foundation for subsequent electrical testing and safe operation.<\/li>\n<\/ul>\n<h4>\n\t\t\t\t\t\tProduction site1\t\t\t\t\t<\/h4>\n<p>\t\t\t\t\t\tThe on-site inspection of the production of the toroidal transformer was strictly carried out in accordance with the production process standards and product quality specifications, and the quality of each production link was controlled throughout the process.\t\t\t\t\t<\/p>\n<h4>\n\t\t\t\t\t\tProduction site2\t\t\t\t\t<\/h4>\n<p>\t\t\t\t\t\tAssembly site for high-power three-phase isolation transformer (380V to 220V) with chassis\t\t\t\t\t<\/p>\n<h4>\n\t\t\t\t\t\tProduction site3\t\t\t\t\t<\/h4>\n<p>\t\t\t\t\t\tProduction site of 100KVA three-phase isolation transformer with bare machine (380V to 220V) for energy storage\t\t\t\t\t<\/p>\n<h4>\n\t\t\t\t\t\tProduction site4\t\t\t\t\t<\/h4>\n<p>\t\t\t\t\t\tMachine tool\/automation equipment 10KVA three-phase isolation transformer bare machine (380V to 220V) production work site\t\t\t\t\t<\/p>\n<h4>\n\t\t\t\t\t\tProduction site5\t\t\t\t\t<\/h4>\n<p>\t\t\t\t\t\tProduction site of 400KVA column voltage regulator (380V)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Installation of power transformers The transformer inst [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":52,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"elementor_header_footer","meta":{"footnotes":""},"class_list":["post-43","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.zjtoppower.com\/index.php\/wp-json\/wp\/v2\/pages\/43","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zjtoppower.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.zjtoppower.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.zjtoppower.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zjtoppower.com\/index.php\/wp-json\/wp\/v2\/comments?post=43"}],"version-history":[{"count":10,"href":"https:\/\/www.zjtoppower.com\/index.php\/wp-json\/wp\/v2\/pages\/43\/revisions"}],"predecessor-version":[{"id":332,"href":"https:\/\/www.zjtoppower.com\/index.php\/wp-json\/wp\/v2\/pages\/43\/revisions\/332"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zjtoppower.com\/index.php\/wp-json\/wp\/v2\/media\/52"}],"wp:attachment":[{"href":"https:\/\/www.zjtoppower.com\/index.php\/wp-json\/wp\/v2\/media?parent=43"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}